Bellevue Residence

The Bellevue Residence is a new three-level custom home on a sloped lot in an established Bellevue, WA neighborhood. The house steps down with the grade, with a daylight lower level that walks out to a rear patio, a main floor that opens onto a wide rear deck, and a roof deck above. Concrete basement […]
Lake Stevens Hangar House

The Lake Stevens Hangar House is a three-story home built over its own aircraft hangar at a small residential airpark outside Lake Stevens, WA. The owner’s plane parks on the ground floor behind a wide hinged hangar door, with a garage beside it, and two floors of living space sit above, wrapped by a rooftop […]
Snyderco Juanita

The Snyderco Juanita project in Kirkland, WA is a new single-family residence with a daylight basement, a main floor and a second floor. Foundation design includes a concrete slab on grade and cantilevered concrete retaining walls along the basement. The main floor cantilevers past the basement below, and the home includes several decks, including a […]
Hartley Produce

The Hartley Produce project in Prosser, WA includes foundation design for a 475’x278′ pre-engineered metal building processing building and a 100’x225′ onion storage warehouse. Inside the warehouse is an approximately 150’x138′ mezzanine constructed of structural steel, braced frames and a composite concrete on metal deck floor system. Design also included cold-formed steel fan rooms and […]
Friends of Disabled Veterans Lodge

New wood-framed lodge with a heavy timber covered entry, glulam beams and a king post ridge truss over the main space, prefabricated attic and scissor trusses, and 2×6 shear walls. Foundations are conventional spread footings with a slab on grade. It sits alongside an existing restroom building that stays in place.
The Landing

New single-story commercial shell building, about 9,954 SF, designed as Phase 2 of The Landing. Wood framed with press plate or RedBuilt roof trusses, wood stud walls sheathed for lateral resistance, storefront glazing around the perimeter and adhered veneer finishes. Includes design of the column-supported canopies. This project was not built. Architecture: LPR Architecture
The Orchards Assisted Living

Single-story addition to an existing assisted living and memory care facility, adding 25 resident rooms, 5 suites and two enclosed breezeways connecting to the existing building. It has wood truss roof framing, wood shear walls and conventional concrete foundations. Architecture: Chris Baugh Architect General Contractor: Peak Contractors
Columbia Point Eye Clinic

New two-story eye care clinic with a ground-floor tenant space. It is a sprinklered Type VB wood-framed building with engineered wood (RedBuilt) floor and roof framing, wood structural panel shear walls, slab on grade and conventional spread and strip footings. This project was not built. Architecture: LPR Architecture General Contractor: Hummel Construction
Mid Columbia Gymnastics

The Mid-Columbia Gymnastics Academy building is a 120’x120′ pre-engineered metal building. Project scope was to provide foundation design for the PEMB structure as well as design wood framed offices and an upper viewing mezzanine. Architecture: LPR Architecture General Contractor: Hummel Construction
Progressions Credit Union

New three-level credit union building with a basement, main floor and upper story. Basement walls are reinforced concrete retaining walls, floors are engineered I-joists, and walls are wood framed and sheathed for lateral resistance. Roof framing is engineered I-joists or press plate trusses. Includes a steel-framed covered drive-thru ATM and teller canopy. Architecture: Fusion Architecture […]